After I re-installed the baseboards in the hallway, I proceeded to start laying the floor in the first bedroom. This bedroom needed to be done first so we could move our furniture into that room to finish the floor in our bedroom.
Following my documented checklist, I ripped out the carpeting and pad. I removed the closet doors. I removed all the tack strips, the baseboards, and return air grille. I pulled out a lot of staples from the padding. I gave each nail on the floor a couple of whacks with the hammer and screwed down the underlayment. I undercut the closet door jambs and the drywall. I painted the walls. Finally, I was ready to install some LVP flooring.
Since I already had one plank started in each room, I had a starting point to begin the job. The first row was critical. Get it laid out correctly, and hopefully the rest goes smoothly. (Well, that was the plan.) This room by the door had a small alcove, so I could not start with a long straight wall. I laid down three short rows until I could get to the wall.
Now that I had the wall to start laying down planks, I measured and ripped down three planks to start. I had my 1/8 inch gap and I used strips of 1/8 inch plywood as shims between the first planks and the wall for my expansion gap. It was time to get moving.
Using my “random pattern” layout, I started my first row of full planks. The manufacturer recommends a random layout so the floors look like the planks are laid out arbitrary’ish. “A more natural look.” My concern is running into issues where the joints are too close together and the layout is too random, if that is possible. (I never considered myself with OCD, but this might confirm it.) Each number represent what the first length of a plank I will start with. In inches, the first plan would be 12 inches, the next 32 inches and for zero, I would use a full 48-inch plank and so on and so on. So, for seven rows you get a consistent “random” pattern. I really think the layout looks better.

Moving along and just a few rows later, I needed to install a plank around the closet door jamb. Using my jig saw to cut the plank, there was no drama here, onto the next row. By the end of the day, I had over half the room done.
I took some measurements and discovered I was not square to the wall. I was off about 1/8 of an inch. I tried to adjust the rows by removing the 1/8-inch plywood shims with some smaller plastic ones to hopefully make an adjustment. As hard as I tried, and being cognizant of not opening up any joints, the floor was set in place and could not be adjusted. I just hoped it would not get worse.
The next day I finished up the room. The last row was, fortunately, a full plank wide. The 1/8 of inch difference still existed, but with additional ½ of inch of expansion gap under the drywall, I was able to make it work.
I reinstalled the baseboards. I was able to give the baseboards a refresh prior to installing them. I applied some stain and gave each board a coat of polyurethane. Using my cordless brad nailer, I made quick work of it. I followed up with a wood filler to fill the nail holes. The room got a new brown register and a freshly painted return air grille to match.
I put back the closet doors. Here is where I needed to make some adjustments. First, the doors were cut to accommodate a carpeted floor. Since there was now no carpeting, I lowered the doors by adjusting the rollers on the top of the door. That was not enough however as the bottom guides still did not touch the doors. I needed to purchase and install floor guides with taller sides. That was a simple and easy solution.

I removed my tools, swept the floor and bedroom number one was done. It was time for our bedroom.
We moved our furniture into the finished bedroom and I started on our bedroom. I already had the closet and three rows of flooring completed for this room when I did the hallway. I went through my checklist, and I finished this room up in two days. I did not do the bathroom for now and just put down a temporary threshold by the bathroom door. We moved our furniture back into our room and I headed to bedroom number three.
Again, I was chucking along on these rooms with each room getting easier as I go until my brain went sideways on me. I needed to cut a plank by the closet door jamb. I miscut the first piece. No biggie, I could use it elsewhere. I cut my next piece the same as the other one. Now I had two planks I needed to use elsewhere. Finally, on my third try, I got it right. The room took less than 2 days, and I was ready to finish bedroom number 4.
Again, with the last bedroom I followed the plan. Of all the rooms, this one probably went the smoothest. Maybe after 3 bedrooms and a hallway, you think I would finally figure it out. I was fortunately that I could use the planks for the last row that I ripped to finish the bedrooms on the other side. Nonetheless, there still was plenty of waste and not because of miscuts. I still had 8 boxes of LVP flooring left to finish the two bathrooms. It looks like I might be returning a couple of boxes. Let me get the bathrooms done first.