We needed to complete the leveling of the back wall. Using my Craftsman® 2-foot level, Rehtorbym and I did our best to square up the wall. We would have better success once we had the two side walls completed. After we ratcheted down the anchor bolt nuts with my Craftsman® socket wrench and my Craftsman®…
-
-
I had the lumber company deliver all the materials to build the garage. Once it arrived and dumped on the grass next to the driveway, it was time to go through the materials to start building. I found the bill of materials and the plans for the garage. With the plans laid out on the…